Upgrid Logo
  • Energie kaufen
  • Energie verkaufen
  • Was ist UPGRID?
BEI UPGRID ANMELDEN
Upgrid Logo

DIENSTLEISTUNGEN

  • Energie kaufen
  • Energie verkaufen
  • Finden Sie Ihre Gemeinde
  • Kostenlose Beratung

UNTERSTÜTZUNG

  • Kontakt
  • Impressum
  • Cookies
  • FAQ

TOOLS

  • Solarproduktions-Rechner
  • Energiespar-Rechner

ÜBER UNS

  • Blog
  • Was ist UPGRID?
  • info@upgrid.ch
  • Upgrid

UPGRID AG

Neugasse 28 , 6340 Baar

((Schweiz))

info@upgrid.ch
Rückruf anfordern

UpGrid AG© 2025

DatenschutzNutzungsbedingungen

Solar Panels in LEG: Planning, Installation, Integration

Apr 9, 2025

Complete guide to integrating solar panels into Local Energy Communities (LEGs) in Switzerland. Planning, installation, optimization.

Cover Image for Solar Panels in LEG: Planning, Installation, Integration

Solar panels are the backbone of many Local Energy Communities (LEGs) in Switzerland. They provide clean, renewable energy directly to the community and make LEGs truly sustainable and economical.

In this comprehensive guide, you'll learn everything about planning, installing, and integrating solar panels into LEGs – from the first idea to optimal use.

Why Solar Panels for LEGs?

Benefits of Photovoltaics in LEGs

1. Local Energy Production:

  • Energy production directly on-site
  • Minimal transmission losses
  • Independence from external sources

2. Economics:

  • Cheaper energy prices for members
  • Fair compensation for producers
  • Typical savings: 15-40%

3. Sustainability:

  • 100% renewable energy
  • CO2 savings: 10-50 tons/year per LEG
  • Contribution to Energy Strategy 2050

Planning Solar Panels in LEGs

Phase 1: Site Analysis

Important Factors:

1. Roof Area:

  • Available area (m²)
  • Orientation (South, South-East, South-West optimal)
  • Inclination (20-40° ideal)
  • Check shading

2. Statics:

  • Roof load-bearing capacity
  • Static review required
  • Reinforcement possible (if needed)

Phase 2: Sizing

Typical Sizes:

  • Small LEG (10-20 members): 20-50 kWp
  • Medium LEG (20-50 members): 50-150 kWp
  • Large LEG (50+ members): 150-500 kWp

Phase 3: Economic Calculation

Cost Analysis:

Cost TypeTypical Cost
Modules (per kWp)800-1,200 CHF
Inverter300-500 CHF/kWp
Mounting System200-400 CHF/kWp
Installation300-500 CHF/kWp
Total (per kWp)2,000-3,000 CHF/kWp

Installation

Step 1: Preparation

1.1 Building Permit:

  • Apply with cantonal authorities
  • Processing: 2-4 weeks
  • Often simplified for rooftop solar

1.2 Award Contract:

  • Select electrical installer
  • Prefer certified companies
  • Get multiple offers
  • Check references

Step 2: Mounting

Duration: 2-5 days (depending on size)

Step 3: Electrical Installation

3.1 Inverter:

  • Installation in technical room
  • Connection to modules
  • Connection to grid

3.2 Meter:

  • Smart Meter Installation
  • Bidirectional meter required
  • Connection to LEG platform

Integration into LEG

Technical Integration

1. Smart Meter Connection:

  • Production data to LEG platform
  • Real-time monitoring
  • Automatic billing

2. Energy Distribution:

  • Priority: Self-consumption
  • Surplus: Community
  • Rest: Feed-in to grid

Legal Integration

1. Ownership:

  • Community ownership (cooperative)
  • Individual ownership
  • Mixed models

Optimization and Maintenance

Production Optimization

Measures:

  • Regular cleaning
  • Avoid shading
  • Use monitoring
  • Technical maintenance

Typical Production Increase: 5-10%

Maintenance

Regular Measures:

  • Cleaning: 1-2x per year
  • Technical review: Annually
  • Software updates: Continuously

Costs: 100-300 CHF/kWp per year

Grants for Solar Panels

Available Grants

1. Federal Grant:

  • One-time payment: 200-300 CHF/kWp
  • Up to 30% of investment costs
  • Maximum 50,000 CHF

Frequently Asked Questions (FAQ)

What system size do I need?

Depends on:

  • Community consumption
  • Available area
  • Budget
  • Grants available

How long does installation take?

Typically:

  • Planning: 2-4 weeks
  • Building permit: 2-4 weeks
  • Installation: 2-5 days
  • Commissioning: 1-2 weeks
  • Total: 6-12 weeks

How much does a solar panel system for an LEG cost?

Typically:

  • 2,000-3,000 CHF/kWp
  • 50 kWp system: 100,000-150,000 CHF
  • After grant: 85,000-135,000 CHF

How much does a solar panel system produce?

Switzerland:

  • 1,000-1,200 kWh/kWp per year
  • 50 kWp = 50,000-60,000 kWh/year

How long does a solar panel system last?

Typically:

  • Lifespan: 25-30 years
  • Performance guarantee: 80% after 25 years
  • Low maintenance

Next Steps

Ready for solar panels in your LEG?

  1. Establish or join LEG: Start your LEG
  2. Site analysis: Check possibilities
  3. Apply for grants: Use available grants
  4. Contact Upgrid: Get advice

Solar panels make LEGs sustainable and economical!


Related Articles:

  • Photovoltaics in LEG: Maximizing Solar Energy Use
  • Energy Storage in LEG: Batteries, Hydrogen, Pumped Storage
  • LEG Cost-Benefit Analysis: How Much Can You Save?
  • Smart Grid Technology for Energy Communities

About Upgrid: Upgrid supports you in integrating solar panels into LEGs. Visit Upgrid.ch for more information.