Upgrid Logo
  • Energie kaufen
  • Energie verkaufen
  • Was ist UPGRID?
BEI UPGRID ANMELDEN
Upgrid Logo

DIENSTLEISTUNGEN

  • Energie kaufen
  • Energie verkaufen
  • Finden Sie Ihre Gemeinde
  • Kostenlose Beratung

UNTERSTÜTZUNG

  • Kontakt
  • Impressum
  • Cookies
  • FAQ

TOOLS

  • Solarproduktions-Rechner
  • Energiespar-Rechner

ÜBER UNS

  • Blog
  • Was ist UPGRID?
  • info@upgrid.ch
  • Upgrid

UPGRID AG

Neugasse 28 , 6340 Baar

((Schweiz))

info@upgrid.ch
Rückruf anfordern

UpGrid AG© 2025

DatenschutzNutzungsbedingungen

Subsidies and Grants for LEG in Switzerland 2025

Mar 5, 2025

Complete overview of subsidies, grants, and financial support for Local Energy Communities (LEGs) in Switzerland 2025.

Cover Image for Subsidies and Grants for LEG in Switzerland 2025

Financial grants and subsidies make establishing and operating Local Energy Communities (LEGs) in Switzerland significantly more attractive. From federal grants to cantonal programs to municipal support – there are numerous ways to financially support LEG projects.

In this comprehensive guide, you'll get a complete overview of all available grants for LEGs in Switzerland 2025.

Overview: Funding Landscape Switzerland

Funding Levels

LEG funding in Switzerland occurs at multiple levels:

1. Federal Level:

  • Federal Office of Energy (BFE)
  • National funding programs
  • Legal incentives

2. Cantonal Level:

  • Cantonal energy offices
  • Regional funding programs
  • Local particularities

3. Municipal Level:

  • Municipal grants
  • Local initiatives
  • Cooperation projects

4. Private Funding:

  • Foundations
  • Energy providers
  • Private investors

Federal Grants: BFE Programs

One-Time Payment for Photovoltaic Systems

What is funded?

  • Installation of new photovoltaic systems
  • Expansion of existing systems
  • Battery storage (with new systems)

Grant Amount:

  • 200-300 CHF per kWp installed capacity
  • Dependent on system size
  • Reduction for large systems

Requirements:

  • System must be grid-connected
  • Meet technical standards
  • Apply before installation

Application Procedure:

  • Application via Pronovo platform
  • Submit before installation
  • Processing: 2-4 weeks

Investment Contributions

What is funded?

  • Energy efficiency measures
  • Renewable energy
  • Storage systems

Grant Amount:

  • Up to 30% of investment costs
  • Maximum 50,000 CHF per project
  • Often combinable with other grants

Requirements:

  • Project must support Energy Strategy 2050
  • Meet technical standards
  • Economic proof

ZEV Grant (Self-Consumption Community)

Special grant for ZEV:

  • Increased feed-in tariff
  • Simplified procedures
  • Technical support

Grant Amount:

  • Up to 20% higher compensation
  • Additional investment contributions possible

Cantonal Grants

Overview by Canton

Zurich:

  • Additional grant: 500-2,000 CHF
  • Simplified procedures
  • Technical advice

Bern:

  • Investment contributions up to 10,000 CHF
  • Operating contributions for first 3 years
  • Support programs

Basel-City:

  • Municipal grants
  • Energy efficiency premiums
  • Cooperation projects

Geneva:

  • International standards
  • Cross-border projects
  • Innovative models

Other Cantons:

  • Inform yourself with your cantonal energy office
  • Grants vary significantly
  • Often adjusted annually

Typical Cantonal Grants

Investment Funding:

  • 10-30% of investment costs
  • Maximum 5,000-15,000 CHF
  • For solar panels, storage, smart meters

Operating Funding:

  • 100-500 CHF/year for first years
  • Support for operating costs
  • Limited duration (1-5 years)

Advisory Funding:

  • Cost coverage for energy advice
  • Technical advice
  • Legal support

Municipal Grants

Municipal Support

Many municipalities fund LEGs:

Typical Measures:

  • Additional investment contributions: 1,000-5,000 CHF
  • Area provision for facilities
  • Administrative support
  • Public relations

Requirements:

  • Local anchoring
  • Contribution to municipal energy strategy
  • Integration of municipality

Private Grants and Foundations

Energy Providers

Funding Programs from Providers:

  • Investment contributions
  • Technical support
  • Cooperation projects

Foundations

Relevant Foundations:

  • Klimastiftung Schweiz
  • Energy Foundation
  • Regional environmental foundations

Typical Grants:

  • 5,000-50,000 CHF per project
  • Focus on innovation
  • Sustainability in foreground

Grant Combinations

Maximize Funding

Tip: Multiple grants can often be combined:

Example Combination:

  • Federal grant: 3,000 CHF
  • Cantonal grant: 2,000 CHF
  • Municipal grant: 1,000 CHF
  • Total: 6,000 CHF funding

Restrictions

Important: Watch for:

  • Combination rules
  • Maximum grants
  • Application deadlines

Application Procedures

Step-by-Step

1. Research:

  • Identify available grants
  • Check requirements
  • Note deadlines

2. Preparation:

  • Create project concept
  • Cost calculation
  • Technical documentation

3. Application:

  • Fill out forms
  • Submit documents
  • Observe deadlines

4. Processing:

  • Wait time: 2-8 weeks
  • Answer inquiries
  • Improvements

5. Approval:

  • Receive grant approval
  • Observe conditions
  • Implement project

Important Deadlines

Typical Deadlines:

  • Application before project start
  • Processing: 2-8 weeks
  • Payment after implementation
  • Proof within 1 year

Grant Amounts in Detail

Photovoltaic Funding 2025

One-Time Payment:

  • ≤10 kWp: 300 CHF/kWp
  • 10-30 kWp: 250 CHF/kWp
  • 30-100 kWp: 200 CHF/kWp
  • 100 kWp: 150 CHF/kWp

Example: 10 kWp system = 3,000 CHF grant

Storage Funding

Battery Storage:

  • 200-400 CHF/kWh storage capacity
  • Maximum 20,000 CHF
  • Only with new systems

Smart Meter Funding

Digital Meters:

  • 100-300 CHF per smart meter
  • Often via grid operator
  • Simplified procedures

Frequently Asked Questions (FAQ)

Which grants can I combine?

Often possible:

  • Federal + Cantonal + Municipal grants
  • Attention: Observe maximum grants
  • Consult expert advice

How long does processing take?

Typically:

  • Federal applications: 4-8 weeks
  • Cantonal: 2-4 weeks
  • Municipal: 1-2 weeks

Must I submit grant application before installation?

Usually yes:

  • One-time payment: Before installation
  • Investment contributions: Before project start
  • Operating grants: Possible after start

What happens if my application is rejected?

Options:

  • Improvement and resubmission
  • Check alternative grants
  • File objection (if entitled)

Can I apply for grants retrospectively?

Rarely:

  • Usually before project start
  • Exceptions possible
  • Inform in time

Tips for Successful Applications

1. Inform in Time

  • Grants change regularly
  • Observe deadlines
  • Inform before project start

2. Professional Support

  • Consult energy advisor
  • Use application assistance
  • Legal advice if needed

3. Documentation

  • All documents complete
  • Technical proof
  • Economic calculation

4. Patience

  • Processing takes time
  • Inquiries possible
  • Don't despair

Next Steps

Ready for grants?

  1. Learn about LEGs: Understand the basics
  2. Check available grants: Federal, Canton, Municipality
  3. Contact Upgrid: We help with applications
  4. Submit grant applications: On time and complete

Grants make LEGs even more attractive – use them!


Related Articles:

  • LEG Cost-Benefit Analysis: How Much Can You Save?
  • LEG Financing Models: From Crowdfunding to Bank Loans
  • Starting an LEG: Step-by-Step Guide with Checklist
  • Legal Framework for LEG in Switzerland 2025

About Upgrid: Upgrid supports you in applying for grants and makes LEG projects financially even more attractive. Visit Upgrid.ch for more information.